KC- 135 Scheduled Maintenance Facility, Tinker AFB, Oklahoma 

PROJECT OWNER
Frankfurt Short Bruza

CONSTRUCTION
2009

Zaxon has completed over 700 construction cost estimating and scheduling projects for government and military facilities and infrastructures, throughout the DFW Metroplex, as well throughout Texas and nationwide. Projects in the Dallas Fort Worth Metroplex include International Terminal D, Dallas/Fort Worth (DFW) International Airport, Fort Worth, Texas; International Terminal A, Dallas/Fort Worth (DFW) International Airport, Fort Worth, Texas; Terminal A Rail Station, Dallas/Fort Worth (DFW) International Airport, Fort Worth, Texas; and Alcon Laboratory, Fort Worth, TX. Below is just one of projects we completed in the state of Oklahoma.. For a larger list of Zaxon’s completed cost management services projects visit our projects page.

This project is for construction of a fully enclosed scheduled maintenance hangar (approximately 28,200 sf) for the KC135 aircraft for the AFR and ANG associated units at tinker AFB. The facility has been designed for isochronal maintenance and does not include painting or fuel cell maintenance. The site is located south of the main diagonal runway at Tinker AFB near two existing hangars, B1030 and B1082. This project includes the demolition of three existing buildings, B1037, B1041, and B1045, within the footprint of the new facility. These three buildings total 12,072 sf. The hangar includes administration area with a ready room, offices, and building services such as hydraulics and wheel shops. Construction of an additional parking lot for privately owned vehicles is also included in this project. This project is for construction of a fully enclosed scheduled maintenance hangar (approximately 28,200 sf) for the KC135 aircraft for the AFR and ANG associated units at tinker AFB. The facility has been designed for isochronal maintenance and does not include painting or fuel cell maintenance. The site is located south of the main diagonal runway at Tinker AFB near two existing hangars, B1030 and B1082. This project includes the demolition of three existing buildings, B1037, B1041, and B1045, within the footprint of the new facility. These three buildings total 12,072 sf. The hangar includes administration area with a ready room, offices, and building services such as hydraulics and wheel shops. Construction of an additional parking lot for privately owned vehicles is also included in this project.

airport_8_1