Ted C. Connell Killeen Airport Terminal Building, Killeen, Texas 

PROJECT OWNER
City of Killeen

CONSTRUCTION
2004

Zaxon, Inc. performed Cost Estimating services on Ted C. Connell Killeen Airport Terminal Building, Killeen, Texas Built with approximately 1,000 tons of structural steel and 9,500 cubic yards of concrete, the new Ted C. Connell Terminal Building at Gray Army Airfield in Killeen was among the first airport terminals in the country designed to be blast resistant. The building was engineered to withstand a bomb blast from the parking lot. Total Project Cost $28,665,072. Program Cost $30,000,000.

airport_4_1